Luminance of main lamp (lx) : 80000-160000
Luminance of SIDE LAMP(lx) : 80000-160000
Color temperature(K) : 3000-6000
COLOR RENDERING INDEX (Ra): 85-100
TOTAL IRRADIANCE (W/m2): A single lamp should not exceed 1000 of total irradiance
Input power (W/A) : 400
Power supply: 220V/50Hz
PACKAGE
Lamps: 108*86*38cm
GW/NW: 27/22KG
Lamps: 108*86*38cm
GW/NW: 27/22KG
lamp holder: 114*59*34cm
GW/NW: 52/48KG
Total 3 cartons
MODEL | LTSL13 | LTSL14 | LTSL15 | LTSL10 | LTSL11 | LTSL12 | |
ILLUMINATION (lx) | THE MAIN LIGHT | / | 80000-160000 | ||||
SIDE LAMP | |||||||
Color temperature (K) | 3000-6000 | ||||||
COLOR RENDERING INDEX (Ra) | 85-100 | ||||||
TOTAL IRRADIANCE (W/m2) | A single lamp should not exceed 1000 of total irradiance | ||||||
INPUT POWER (W/A) | 200 | 400 | 400 | 200 | 400 | 200 |
Pre-Sales Service |
* For all your inquires about us, we will reply you in detail within 24 hours. * We own well-trained and professional sales who can speak fluent English. *We offer OEM services. We can print your own logo on LTSL14 Overall reflection Operation Shadowless Lamp,also can customize the retail box packing and other things. * View our company. |
After-Sales Service |
* We have very experienced engineers ,can help you better use LTSL14 Overall reflection Operation Shadowless Lamp.Training how to instal the machine, training how to use the machine. *If has product fault need to repair, please contact us, and we will cooperate with your engineers to try to deal the fault in the local firstly, so as to minimize the transportation and other cost. *We will guide you how to deal the troubleshooting, and your engineers follow our guidance to solve fault. *If need parts for replacement, we will send to you. *If still can not solve the fault at last, please arrange to deliver the fault parts back to us for repair. |
Delivery | |
---|---|
DHL/EMS/FedEx/TNT/Ups etc. | |
Delivery Details | 1.We ship goods by UPS/DHL/FEDEX/ TNT express takes 3~5 days to arrive , which is door to door, you no need go out can get LTSL14 Overall reflection Operation Shadowless Lamp. 2.We can also help you ship by air cargo, it takes about 2-7 days to arrive, while you need to go to Air port to take LTSL14 Overall reflection Operation Shadowless Lamp. 3.If goods are large quantity and you need not so urgently ,you can choose by sea to save some freight cost which takes you about one month to get LTSL14 Overall reflection Operation Shadowless Lamp. |
No matter what delivery way ,depending on your actual requirements...
Q:What’s the minimum order quantity (MOQ)?
A:For most of our medical products, even order for only one unit is warmly welcomed.
Q: Can you do OEM/ private label?
A: Of course we can do OEM/private label for you.
Q: What’s your delivery time?
A: Generally it is 10 days if the goods are in stock.
or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: How to ship the order?
A: Please inform us your instruction, by sea, by air or by express, any way is ok for us. We have very professional forwarder to provide the best shipping cost, service and guarantee.
Q: What is your terms of payment ?
A: We accept T/T ,LC,Western Union ,Escrow ,Paypal and more.Please suggest your preferred payment method.